The access mode is only available for the Solid-State End Station. Maximum 6 shifts (24 hrs) can be allocated for a single proposal. A fast-access proposal can only be scheduled in a predefined time. In the spring 2025 semester, the SPECS electron analyzer of the SSES will be refurbished. Therefore, we can schedule a Fast Access proposal only on June 10. Further information about different kinds of fast access proposals and their availability at FinEstBeAMS can be found here.

Follow this link to read more about all MAX IV Access modes.

Page manager: Kirill Chernenko January 31, 2025