Technical Notes

…Internal_Note_20150129_MIK_Analysis_150130.pdf Internal_Note_20150930_MW_Threshold.pdf insertion devices Internal_Note_20090922_Insertion_Devices_for_the_MAX_IV_3_GeV_Storage_Ring.pdf Internal_Note_20100215_Insertion_Devices_for_the_MAX_IV_3_GeV_Ring.pdf Internal_Note_20101209_Elliptically_Polarising_Undulators_with_11_mm_Magnetic_Gap_at_the_MAX_IV_3_GeV_Ring.pdf Internal_Note_20111110_Comparison_Brilliance_MAX_IV_NSLS-II.pdf Internal_Note_20111220_Elliptically_polarizing_undulators_for_the_Arpes_beamline_at_the_Solaris_Light_Source.pdf RF cavities Internal_Note_20240410 Harmonic Cavity Parameters for Flat Potential Arbitrary Order R1 beam dynamics Internal_Note_20100820_M5_Pulsed_Sextupole_Injection_120611.pdf Internal_Note_20111102_Updated_Lattice_120611.pdf Internal_Note_20120313_Updated_Lattice_120611.pdf Internal_Note_20120904_Updated_Lattice_120913.pdf Internal_Note_20140526_High-chromaticity_1.5GeV_140604.pdf insertion devices…

Staff

The Design Office team consists of the following people Design Office Common contact Office location: D110053 E-mail: mechanical@maxiv.lu.se Joaquin Gonzalez E-mail: joaquin.gonzalez@maxiv.lu.se Phone: +46462226511 Linus Roslund Mechanical designer Office location:…

High-Temperature Cell

…of inlet and outlet gas composition Analyser apertures 0.3 mm Gas dosing (available 2018-I) up to 8 individual gases (by user request) and their mixture. Fully automatic gas dosing system…

A record year for research at MAX IV

…2023 (ISSUU) Download the report: MAX IV Annual Report 2023 (PDF) NB: A few minor corrections have been made to the digital and printed versions since this article was published….

Experimental station

Once completed, the DanMAX experiment station will host two instruments for powder diffraction and one for full-field imaging and tomography. Currently, we have the first of the powder diffraction instruments,…

Microscope

…(K) ~ 370 (650) / -163 (110) Tip cooling / cryo-STM No Imaging at arbitrary temperature Yes Lockin amplifier SRS830 Techniques available STM, STS, dI/dV mapping, ncAFM**, dF/dV (~KPFM) and…

Technical Infrastructure

The Technical Infrastructure team is part of Engineering II and is in charge of Cooling, Ventilation, Compressed air, Cryo and gas systems. The team supports the entire MAX IV laboratory…

Workshop: Industrial utilisation of MAX IV

…use of large-scale research infrastructures. The program includes case studies with industry, demonstration of developed hardware and software, panel discussions and mingling. Register no later than January 25, 2023, here….

Staff

…Photoluminescence end station E-mail: Kirill.Chernenko@maxiv.lu.se Phone: +46462226584 Weimin Wang Research Engineer Responsibilities: Solid-state end station E-mail: weimin.wang@maxiv.lu.se Phone: +46462226574 Calle Preger Postdoc Responsibilities: Development and commissioning of Aerodynamic lens sample…