Governance structure

…issues the PI group raises are discussed within the Study Program Committee. The PRISMAS Selection Panel and Local Selection Committees are the central evaluating bodies in the student recruitment process….

Survey, Alignment and Mechanical stability

…making sure it will be designed in a functional way with respect to both alignment and stability. When a component is delivered it is measured, or fiducialized, before placed in…

Sample Environments

compatible with our sample scanner can be used. If a different sample support is needed, contact the beamline staff before proposal submission or well in advance of an approved experiment….

xrdPlanner: a new, versatile beamtime planner

…be installed using the Python package installer (pip).  GitHub project page: https://github.com/LennardKrause/xrdPlanner. For further information, contact Lennard Krause. Publication Krause, L., Gjorup, F. H. & Jørgensen, M. R. V. xrdPlanner: exploring…

1.5 GeV storage ring

The MAX IV 1.5 GeV storage ring is based on a compact double-bend achromat lattice for the production of bright soft x-ray and UV radiation. The storage ring is a…

A cloudy route for shipping in the Arctic

combustion in, for example, black carbon, soot or sulphates. Shippers meet the compliancy standard today with use of sulphur removing devices, namely scrubbers, or fuel with low sulphur content (FSC)….

Prepare sample shipments with EXI at MAX IV

…the courier for the transport of both incoming and departing dewars. Please be prepared to order the return shipment before the beamtime, and be sure to attach the return papers…

Practical information

…to you.   Before coming to MAX IV Here are the steps you must complete before traveling to MAX IV: Your proposal is accepted and scheduled by beamline staff, your…