Safety requirements for contractors

…ute ur hytten. För att säkerställa att ingen är kvar i strålrörshytten måste den sökas av innan strålning tillåts. Under avsökningsproceduren blinkar den orange lampan på panel*]}*en och sirenen med

User information

…(See: https://www.maxiv.lu.se/users/proposal-calls/) Most of the beamlines at MAX IV Laboratory are oversubscribed, so proposals should be compelling and carefully written in order to be chosen by the advisory committee. If access…

Post beamtime

…The following page contains details and instructions on how to proceed. https://www.maxiv.lu.se/beamlines-accelerators/controls-it/it-services/ Data format NanoMAX records data as compressed hdf5 files, a binary file type which stores data in a…

Survey, Alignment and Mechanical stability

…our global CAD model. Our alignment reference network consists of more than 3000 points and has a RMS error of less than 100µm.  When the components for the accelerators and…

Honeycomb silicon carbide: a research surprise

…what it means. “Before this work, it was unclear if it was even possible,” Polley said. https://www.youtube.com/watch?v=78gfeq-yd8g Read more on the research: Bottom-up Growth of Monolayer Honeycomb SiC (Arxiv.org, 2023)…

Data Access

…files are written to be NeXuS compatible. The raw files are stored in /data/visitors/cosaxs/#Proposal/#Visit/raw/ while reduced files are stored in /data/visitors/cosaxs/#Proposal/#Visit/process/.  Each scan will be saved with the name scan-####.h5…

User information AFM

…2023 (See: https://www.maxiv.lu.se/users/proposal-calls/) Most of the beamlines at MAX IV Laboratory are oversubscribed, so proposals should be compelling and carefully written in order to be chosen by the advisory committee….

Microscopy labs

…hours/shift, 6 shifts/day, 5 days. As of Spring’23 run the research infrastructure of Microscopy labs at MAX IV is available via self-service booking system. See the guide on how to…