Technical Infrastructure
The Technical Infrastructure team is part of Engineering II and is in charge of Cooling, Ventilation, Compressed air, Cryo and gas systems. The team supports the entire MAX IV laboratory…
The Technical Infrastructure team is part of Engineering II and is in charge of Cooling, Ventilation, Compressed air, Cryo and gas systems. The team supports the entire MAX IV laboratory…
…materials research as part of a recently completed project funded by Vetenskapsrådet (DNR: 2018-06378). The project has focused on tackling challenges that limit the industrial use of these types of…
…Photoluminescence end station E-mail: Kirill.Chernenko@maxiv.lu.se Phone: +46462226584 Weimin Wang Research Engineer Responsibilities: Solid-state end station E-mail: weimin.wang@maxiv.lu.se Phone: +46462226574 Calle Preger Postdoc Responsibilities: Development and commissioning of Aerodynamic lens sample…
…discovered that while the zigzag graphene nanoribbon monolayer sank almost completely into a silicon carbide facet, its lower edge dissolved and mixed with the silicon carbide substrate. The researchers highlighted…