Microscope

…from/to most of the beamlines at 1.5 GeV ring and HiPPiE at 3 GeV ring without breaking the ultra-high vacuum conditions. Analysis chamber specifications Base pressure 7×10-11 mbar Sample heating…

Technical Infrastructure

…with design, installation and operation of different equipment such as cooling units, ventilation, gas cabinets. The team is also supporting Facility Manager with ventilation and cooling coordination from external provider…

Workshop: Industrial utilisation of MAX IV

…use of large-scale research infrastructures. The program includes case studies with industry, demonstration of developed hardware and software, panel discussions and mingling. Register no later than January 25, 2023, here….

Staff

…delivery system and aerosol research at MAX IV. Research Interests Aerosol technology; nanoparticle research. E-mail: Calle.Preger@maxiv.lu.se Phone: 0703960746 Amirreza Ghassami E-mail: Amirreza.Ghassami@maxiv.lu.se Phone: +46462224506 Beamline Spokesperson Marko Huttula University of…