Technical Infrastructure

The Technical Infrastructure team is part of Engineering II and is in charge of Cooling, Ventilation, Compressed air, Cryo and gas systems. The team supports the entire MAX IV laboratory…

Workshop: Industrial utilisation of MAX IV

…materials research as part of a recently completed project funded by Vetenskapsrådet (DNR: 2018-06378). The project has focused on tackling challenges that limit the industrial use of these types of…

Staff

…Oulu (FIRI coordinator) E-mail: marko.huttula@oulu.fi Phone: +358 40 056 6218 Edwin Kukk University of Turku E-mail: edwin.kukk@utu.fi Phone: +358 2 333 6089 Mika Lastusaari University of Turku E-mail: mika.lastusaari@utu.fi Phone:…

The new MAX IV website

…The previous web version is still available to access on: maxiv-legacy.maxiv.lu.se although the latest updated information is only available on the new web. Contact MAX IV Communication team for web support….

Preparation chamber

…Open cycle, compressed air or “cold gas” N2 Temperature control Home-made sampleplates with a thermocouple Thermocouple on cryostat Pyrometer Sputtering Dedicated Ar line, automated sputtering (*under development) Characterization LEED and…