Calls

…between 1st of March 2024 and 28th of February 2028. The open PhD positions will be published on the MAX IV website as well as Euraxess and the website of each participating university. See the full list of partners under Universities and partners….

Acknowledgement and References

…appropriate references in your publications. Acknowledging data collected at BioMAX The general format for MAX IV beamtime acknowledgement is available on the MAX IV user policy pages Please also cite the…

Organization

…is the legal entity of the laboratory. Until the end of 2015, MAX IV Laboratory included both the operation of MAX-lab (MAX I, II, and III) and the MAX IV…

Governance

MAX IV Laboratory is a Swedish national laboratory hosted by Lund University (Swedish Code of Statutes SFS 1994 946 / SFS 2011 1567). Lund University is the legal entity of the laboratory. The…

History

…the MAX project in the Finance Bill, and MAX receives its first funding. 1983 The MAX team moves into the Northern Apparatus Hall in the M building. MAX I is…

Accelerator Documentation – peer reviewed articles

…Phys. Res., Sect. A 806, 221-230 (2016) G. Skripka, R. Nagaoka, M. Klein, F. Cullinan, P.F. Tavares http://dx.doi.org/10.1016/j.nima.2015.10.029 A chopper system for the MAX IV thermionic pre-injector Nucl. Instrum. Methods…

Optics

…0.31 m 0.18 m Incidence angle at mirror center 2.7 mrad 2.5 mrad Reflection direction Downward Rightward Substrate size (L x W x H) 150 x 30 x 50 mm…

Beamline optics

…flux, 2400 L/mm (cPGM) for higher energy resolution, and 4000 L/mm (cNIM) for preserving polarization purity at low energies. Optical microscope XY map of Au4f core level Spot size The…